Illustrative rendering

EDGE Residential · Coming soon

Power for your home.Capacity for the grid.

Explore our planned solar, storage and EDGE-owned GPU compute program. Available only in select areas of Texas. Enter your address to check availability.

Join the residential waitlist

Planned residential program

A fixed rate.A long-term approach.

A power purchase agreement designed around solar generation, storage and participation in a coordinated energy network.

Available only in select areas of Texas. Enter your address to check availability.

Planned / illustrative pricing and equipment, subject to change and final agreements. This is not a binding price quote.

12¢/kWh

Planned Base Rate for 20 years.

No escalator on the Base Rate. $0 down.

80 kWh

Battery storage

Rooftop solar

Roof coverage planned for the property

2 hybrid inverters

Integrated power conversion

GPU compute unit

EDGE-owned equipment that runs AI workloads using power from your system

Disclosure

What else is installed at your home.

Host-site compensation

Planned host-site compensation choices.

01$1,000

One-time payment after installation

OR$100/month

Monthly host-site payment

Planned program terms, subject to final agreements.

How it works

Your property.Part of a connected system.

Solar produces power. Storage adds flexibility. Coordinated resources support the home and eligible utility programs.

Generate

Rooftop solar generates energy close to where it is used.

Store

Batteries store energy for resilience and flexible dispatch.

Serve the property

A connected microgrid coordinates generation, storage and property loads.

Join the network

A virtual power plant coordinates eligible sites for utility and grid programs.

EDGE coordinates project development and engineering, procurement and construction delivery, then owns and operates the infrastructure for the long term. Configuration, backup capability and utility participation depend on the property and applicable approvals.

Homeowner questions

What homeownersask first.

Do I pay for the equipment?

Under the planned program, EDGE develops, finances, owns and operates the system. Illustrative pricing is $0 down, with a planned Base Rate of 12¢ per kWh for the power it produces, subject to final agreements.

Does the rate go up?

The illustrative 12¢/kWh Base Rate is planned for 20 years with no escalator. Electricity above your Annual Energy Allocation is billed at the Excess Energy Rate, which starts at 15¢/kWh and increases 2.99% each year.

Why is there compute equipment at my home?

In addition to rooftop solar, battery storage, and inverters, EDGE installs and operates computing equipment (including graphics processing units, or “GPUs”) at your property to support EDGE’s distributed computing and grid-services operations. This equipment is owned and controlled by EDGE, draws electricity generated and stored at your home, and generates some heat and noise during operation. It connects to EDGE’s network and uses internet/network connectivity at the property. The host-site compensation described above is paid to you in consideration for hosting this equipment. Eligibility, equipment specifications, space and electrical requirements, connectivity requirements, and EDGE’s access rights are described in your Power Purchase Agreement and Host-Site Agreement.

What gets installed?

Rooftop solar planned for your roof, about 80 kWh of battery storage 2 hybrid inverters and an EDGE-owned GPU compute unit. Final design depends on a property assessment.

What happens when the grid fails?

Battery storage can support backup operation, subject to the home's final design, connected loads and stored energy. EDGE reviews backup capability with you; there is no blanket guarantee of uninterrupted power.

Who takes care of the system?

EDGE owns and operates the infrastructure. Maintenance responsibilities and service arrangements are defined in your applicable agreement.

How does host-site compensation work?

Host-site compensation is paid in exchange for hosting EDGE-owned equipment, including the computing equipment described above. You choose one option — a one-time $1,000 payment after installation or $100 per month — not both. Full host-site compensation terms, eligibility, duration, payment timing and termination conditions will be included in the agreement provided before signing. Eligibility, payment timing and termination terms are set out in the Host-Site Agreement. Payments may be taxable income; consult your tax adviser.

What is a virtual power plant?

Eligible homes are coordinated together so their batteries can support utility and grid programs, while your home keeps its own backup priority.

How do I join the waitlist?

Submit a waitlist request through Connect with EDGE. This is not an application, enrollment or agreement and does not obligate you or EDGE.

Residential imagery is illustrative, not a photograph of an identified EDGE installation.

Your next step

Start withyour home.